logo

PA/DOT: I-81 Reconstruction

Sector: Bridge • Location: Pennsylvania, United States of America

Source: Dodge USA

Project
Planning Schematics

Both Agreements, E05416 & E05528, will be part of Mentor Prot g Program. Work to include the rehab or replacement of structures. Preliminary Engineering, Environmental Services, Final Design, Right of Way Acquisition and Construction Services including but not limited to the following tasks: survey, line & grade, utilities, environmental clearance, pavement design, TS&L, design field view, right o

Status
Prospective
Sector
Bridge, Power Transmission, Road, Commercial, Power Generation (CCGT)
Location
Pennsylvania, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about PA/DOT: I-81 Reconstruction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “PA/DOT: I-81 Reconstruction” is an infrastructure initiative in the Bridge sector, located in Pennsylvania, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Both Agreements, E05416 & E05528, will be part of Mentor Prot g Program. Work to include the rehab or replacement of structures. Preliminary Engineering, Environmental Services, Final Design, Right of Way Acquisition and Construction Services including but not limited to the following tasks: survey, line & grade, utilities, environmental clearance, pavement design, TS&L, design field view, right of way plans, traffic control plans, cultural resource studies, roadway plans, foundation reports,...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Power Transmission, Road, Commercial, Power Generation (CCGT)

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project