PADOT: PA 756 Paving Improvements
Sector: Water Supply and Storage • Location: Richland Township, Pennsylvania, United States of America
Source: Dodge
Preliminary engineering, environmental studies, final design, and services during construction for resurfacing, intersection, and corridor improvements on Bedford Street (PA 756) from Lamberd Avenue to Alvin Street and on the PA 756 (Elton Road) corridor from T-464 (Alvin Street) to T-737 (Industrial Park Road), both in Geistown Borough and Richland Township, Cambria County. 9-0 Cambria Corridor S
- Status
- Prospective
- Sector
- Water Supply and Storage, Car parking, Commercial, Manufacturing (Industrial), Automotive, Road, Waste Processing and Treatment
- Location
- Richland Township, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about PADOT: PA 756 Paving Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Preliminary engineering, environmental studies, final design, and services during construction for resurfacing, intersection, and corridor improvements on Bedford Street (PA 756) from Lamberd Avenue to Alvin Street and on the PA 756 (Elton Road) corridor from T-464 (Alvin Street) to T-737 (Industrial Park Road), both in Geistown Borough and Richland Township, Cambria County. 9-0 Cambria Corridor Safety Improvement PA 756 - Alvin St to Industrial Park Rd Resurface |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Richland Township |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Commercial, Manufacturing (Industrial), Automotive, Road, Waste Processing and Treatment |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
