logo
ProjectClosed

PA/DOT: SR 11 Bridge Rehabilitation

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The project involves the superstructure replacement of the existing single span reinforced concrete t-beam bridge under fill with a single span composite pre-stressed concrete spread box beam bridge under fill carrying SR 0011 over Hunlock Creek, in Luzerne County. Traffic will be staged during construction and the SR 0011 northbound left turn traffic will be detoured during construction. Other wo

Status
Closed
Sector
Cement, Rail, Commercial, Bridge, Road
Location
Hunlock Creek, Pennsylvania, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about PA/DOT: SR 11 Bridge Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “PA/DOT: SR 11 Bridge Rehabilitation” is an infrastructure initiative in the Cement sector, located in Hunlock Creek, Pennsylvania, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the superstructure replacement of the existing single span reinforced concrete t-beam bridge under fill with a single span composite pre-stressed concrete spread box beam bridge under fill carrying SR 0011 over Hunlock Creek, in Luzerne County. Traffic will be staged during construction and the SR 0011 northbound left turn traffic will be detoured during construction. Other work includes retaining wall construction, approach roadway reconstruction, guide rail replacement,...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

City

Hunlock Creek

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Cement, Rail, Commercial, Bridge, Road

Article published date

2024-11-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project