PA/DOT: SR 2003 Bridge Replacement
Sector: Water Supply and Storage • Location: New Berlin, Pennsylvania, United States of America
Source: Dodge USA
The Description And Location Of The Project Are As Follows: Furnish And Install Box Culvert, Tree Removal And Other Miscellaneous Construction At A Department Prepared Site, As Indicated On The Approved Drawings Included In The Bid Package For State Route 2003, Section 012, In Union County, Buffalo Township From Approximately 0.5 Miles South Of Pleasant Ridge Road At Segment 0090 Offset 2141 To Ap
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Description And Location Of The Project Are As Follows: Furnish And Install Box Culvert, Tree Removal And Other Miscellaneous Construction At A Department Prepared Site, As Indicated On The Approved Drawings Included In The Bid Package For State Route 2003, Section 012, In Union County, Buffalo Township From Approximately 0.5 Miles South Of Pleasant Ridge Road At Segment 0090 Offset 2141 To Approximately 0.6 Miles North Of Sr 45 At Seg 110 Offset 3132. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
