logo
ProjectBidding

PA/DOT: SR 3039 Bridge Deck Replacement

One of 10,000+ projects Taiyo tracks in Pennsylvania.

Source: Dodge

This project is the bridge replacement of the existing structure carrying SR 3039 (Anthony Run Road) over Anthony Run with a new precast reinforced concrete box culvert and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 3039, SECTION 450, in Indiana COUNTY Armstrong TOWNSHIP from approximately 500 feet from the start of the exist

Status
Prospective
Sector
Water Supply and Storage, Cement, Bridge, Road, Commercial, Waste Processing and Treatment
Location
Armstrong Township, Pennsylvania, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about PA/DOT: SR 3039 Bridge Deck Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “PA/DOT: SR 3039 Bridge Deck Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Armstrong Township, Pennsylvania, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project is the bridge replacement of the existing structure carrying SR 3039 (Anthony Run Road) over Anthony Run with a new precast reinforced concrete box culvert and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 3039, SECTION 450, in Indiana COUNTY Armstrong TOWNSHIP from approximately 500 feet from the start of the existing structure at segment 0040 offset 1743 to approximately 400 feet from the end of the existing ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

City

Armstrong Township

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Bridge, Road, Commercial, Waste Processing and Treatment

Article published date

2025-08-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project