PA/DOT: SR 4010 Weatherly Retaining Wall Replacement
Sector: Power Transmission • Location: Lansford, Pennsylvania, United States of America
Source: Dodge
The full design build project consists of the rehabilitation of approximately 164 LF and replacement of approximately 186 LF of retaining wall along Hudsondale Street and Hazel Creek, drainage improvements, upgraded guiderail and barrier, utility pole relocations and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 4010, SECTION WW
- Status
- Closed
- Sector
- Power Transmission, Manufacturing (Industrial), Commercial, Power Generation (CCGT), Road, Waste Processing and Treatment
- Location
- Lansford, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about PA/DOT: SR 4010 Weatherly Retaining Wall Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The full design build project consists of the rehabilitation of approximately 164 LF and replacement of approximately 186 LF of retaining wall along Hudsondale Street and Hazel Creek, drainage improvements, upgraded guiderail and barrier, utility pole relocations and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 4010, SECTION WWR, in Carbon County, Weatherly Borough from segment 0190 offset 0951 to approximately Main Street... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Lansford |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Manufacturing (Industrial), Commercial, Power Generation (CCGT), Road, Waste Processing and Treatment |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
