PA/DOT: SR 4015 Zuck Road Improvements
Sector: Water Supply and Storage • Location: Erie, Pennsylvania, United States of America
Source: Dodge USA
This project is the construction of approximately 1.890 miles from SR 4015/Segment 0010/Offset 0519 to SR 4015/Segment 0040/Offset 0981, including construction of asphalt and cement concrete pavements, drainage, guiderail, traffic signals, signing, delineators, pavement markings, sidewalk, traffic signals, highway lightings, and waterline relocation, as indicated on the approved drawings included
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Commercial
- Location
- Erie, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about PA/DOT: SR 4015 Zuck Road Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is the construction of approximately 1.890 miles from SR 4015/Segment 0010/Offset 0519 to SR 4015/Segment 0040/Offset 0981, including construction of asphalt and cement concrete pavements, drainage, guiderail, traffic signals, signing, delineators, pavement markings, sidewalk, traffic signals, highway lightings, and waterline relocation, as indicated on the approved drawings included in the Bid Package. Zuck Rd: Zimmerly to 26th St |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Erie |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Commercial |
Article published date | 2023-05-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
