logo
ProjectClosed

PA/DOT: SR 507 Bridge Replacement

Closed · Pennsylvania · Last reported May 2023

Source: Dodge USA

For the improvement of certain section of roadway and box culvert in PIKE COUNTY, Palmyra Township, COMMONWEALTH OF PENNSYLVANIA, STATE ROUTE 0507, SECTION 450. The project being situated as follows: From approximately 3 miles Northeast of the intersection with I-84, Exit 20 at Segment 0100 Offset 1629 (Station 274+50) to a point approximately 8 miles Southwest of the intersection with SR 0309 at

Status
Closed
Sector
Water Supply and Storage, Bridge, Road, Waste Processing and Treatment, Commercial
Location
Pennsylvania, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about PA/DOT: SR 507 Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “PA/DOT: SR 507 Bridge Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Pennsylvania, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

For the improvement of certain section of roadway and box culvert in PIKE COUNTY, Palmyra Township, COMMONWEALTH OF PENNSYLVANIA, STATE ROUTE 0507, SECTION 450. The project being situated as follows: From approximately 3 miles Northeast of the intersection with I-84, Exit 20 at Segment 0100 Offset 1629 (Station 274+50) to a point approximately 8 miles Southwest of the intersection with SR 0309 at Segment 0110 Offset 0643 (Station 285+25) along SR 0507 Sec 450, Lake Wallenpaupack Road with a t...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Bridge, Road, Waste Processing and Treatment, Commercial

Article published date

2023-05-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project