PA/DOT: SR 51 ADA Curb Ramp Safety Improvement
Sector: Cement • Location: Clairton, Pennsylvania, United States of America
Source: Dodge
Concrete curb ramps, utility coordination. For the construction of concrete curb ramps, detectable warning surfaces, asphalt pavement patching, curb and sidewalk, traffic signals, pavement markings, and other miscellaneous construction, all within a length of 229,251 feet (43.41 miles) as indicated on the drawings approved for 2025 ADA CURB RAMP PROJECT in ALLEGHENY, BEAVER, AND LAWRENCE COUNTIES,
- Status
- Closed
- Sector
- Cement, Mass Transit, Road, Government, Rail, Power Transmission, Commercial, Power Generation (CCGT), Car parking, Automotive
- Location
- Clairton, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about PA/DOT: SR 51 ADA Curb Ramp Safety Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Concrete curb ramps, utility coordination. For the construction of concrete curb ramps, detectable warning surfaces, asphalt pavement patching, curb and sidewalk, traffic signals, pavement markings, and other miscellaneous construction, all within a length of 229,251 feet (43.41 miles) as indicated on the drawings approved for 2025 ADA CURB RAMP PROJECT in ALLEGHENY, BEAVER, AND LAWRENCE COUNTIES, VARIOUS MUNICIPALITIES, |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Clairton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Mass Transit, Road, Government, Rail, Power Transmission, Commercial, Power Generation (CCGT), Car parking, Automotive |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
