PA/DOT: SR 522 Bridge Replacement
Sector: Water Supply and Storage • Location: Middleburg, Pennsylvania, United States of America
Source: Dodge
The description and location of the project are as follows replacement of the bridge over a Tributary to Beaver Creek on SR 522 and SR 235 with a box culvert, intersection widening, guide rail updates, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 522 SECTION 075, in SNYDER COUNTY SPRING TOWNSHIP from approximately 0.6 miles
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The description and location of the project are as follows replacement of the bridge over a Tributary to Beaver Creek on SR 522 and SR 235 with a box culvert, intersection widening, guide rail updates, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 522 SECTION 075, in SNYDER COUNTY SPRING TOWNSHIP from approximately 0.6 miles NORTHEAST of the intersection with SR 235 at Segment 0140, Offset 1182 to approximately 0.5 mile... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
