PA/DOT: SR 88 Resurfacing Improvements
Sector: Water Supply and Storage • Location: Pittsburgh, Pennsylvania, United States of America
Source: Dodge
The description of the project is as follows:For the milling, resurfacing, shoulder repair, base repair, drainage, guide rail, pavement marking, and other miscellaneous construction, all within a length of 35,256 linear feet (6.68 miles) as indicated on the approved drawings included in the bid package for ALLEGHENY GROUP 111-25-7135-2 in ALLEGHENY COUNTY, BETHEL PARK, JEFFERSON HILLS, PLEASANT HI
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment, Rail, Car parking, Road, Mass Transit, Manufacturing (Industrial), Automotive
- Location
- Pittsburgh, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about PA/DOT: SR 88 Resurfacing Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The description of the project is as follows:For the milling, resurfacing, shoulder repair, base repair, drainage, guide rail, pavement marking, and other miscellaneous construction, all within a length of 35,256 linear feet (6.68 miles) as indicated on the approved drawings included in the bid package for ALLEGHENY GROUP 111-25-7135-2 in ALLEGHENY COUNTY, BETHEL PARK, JEFFERSON HILLS, PLEASANT HILLS, WEST MIFFLIN, AND WHITEHALL BOROUGHS, AND SOUTH PARK TOWNSHIP, Commonwealth of Pennsylvania.... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Pittsburgh |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment, Rail, Car parking, Road, Mass Transit, Manufacturing (Industrial), Automotive |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
