logo
ProjectBidding

PA/DOT: SR928 Tannery Road Bridge Replacement

One of 10,000+ projects Taiyo tracks in Pennsylvania.

Source: Dodge USA

This project is the Bridge replacement on PA 928 over Esther Run in Ayr Township, Fulton County. The project includes full-depth reconstruction, mill/overlay of the roadway approaches, drainage replacement, and guide rail upgrades, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0928, SECTION 04B, in FULTON COUNTY AYR TOWNSHIP

Status
Prospective
Sector
Water Supply and Storage, Mass Transit, Road, Bridge, Waste Processing and Treatment, Commercial, Manufacturing (Industrial), Rail
Location
Shade Gap, Pennsylvania, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about PA/DOT: SR928 Tannery Road Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “PA/DOT: SR928 Tannery Road Bridge Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Shade Gap, Pennsylvania, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project is the Bridge replacement on PA 928 over Esther Run in Ayr Township, Fulton County. The project includes full-depth reconstruction, mill/overlay of the roadway approaches, drainage replacement, and guide rail upgrades, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0928, SECTION 04B, in FULTON COUNTY AYR TOWNSHIP from approximately segment 0210 offset 2567 to approximately segment 0220 offset 0359.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

City

Shade Gap

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Mass Transit, Road, Bridge, Waste Processing and Treatment, Commercial, Manufacturing (Industrial), Rail

Article published date

2024-12-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project