PA/DOT: T-396 Bridge Replacement
Sector: Water Supply and Storage • Location: Danville, Pennsylvania, United States of America
Source: Dodge USA
The description and location of the project are as follows: Replacement of the existing bridge carrying T-396 over East Branch Chillisquaque Creek in Derry Township, Montour County, with reinforced concrete box culvert, other work included in bid package adjust vertical alignment, full depth paving, guide rail and other related work within an overall length of 591.00 linear feet (0.112 miles) as i
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The description and location of the project are as follows: Replacement of the existing bridge carrying T-396 over East Branch Chillisquaque Creek in Derry Township, Montour County, with reinforced concrete box culvert, other work included in bid package adjust vertical alignment, full depth paving, guide rail and other related work within an overall length of 591.00 linear feet (0.112 miles) as indicated on approved drawings for TOWNSHIP ROAD T-396 (Crawford Road), from approximately 0.3 mil... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
