PA/DOT: Way Hollow Road Improvements
Sector: Water Supply and Storage • Location: Edgeworth, Pennsylvania, United States of America
Source: Dodge USA
The description and location of the project is as follows: For the roadway paving, drainage, guide rail, slope repairs, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 4037, SECTION A01, in ALLEGHENY COUNTY, SEWICKLEY HEIGHTS and EDGEWORTH BOROUGHS, Commonwealth of Pennsylvania. This project being situated as follows: From a p
- Status
- Closed
- Sector
- Water Supply and Storage, Rail, Mass Transit, Commercial, Road, Waste Processing and Treatment
- Location
- Edgeworth, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about PA/DOT: Way Hollow Road Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The description and location of the project is as follows: For the roadway paving, drainage, guide rail, slope repairs, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 4037, SECTION A01, in ALLEGHENY COUNTY, SEWICKLEY HEIGHTS and EDGEWORTH BOROUGHS, Commonwealth of Pennsylvania. This project being situated as follows: From a point on SR 4037 at Segment 0010 Offset 0000 (Station 100+00.00) to Segment 0020 Offset 3045 (Stat... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Edgeworth |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Rail, Mass Transit, Commercial, Road, Waste Processing and Treatment |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
