logo
ProjectPlanned

Page Road Bridge Replacement

Planned · New Hampshire · Last reported Mar 2025

Source: Patch

The Page Road Bridge Replacement project involves replacing an existing bridge built in 1950 that is currently on the NHDOT Municipal Bridge 'Red List' due to deficiencies. The project is funded by the NHDOT bridge aid program, covering 80% of the costs, while the Town of Bow will cover the remaining 20%.

Status
Prospective
Sector
Government, Bridge, Road
Location
Bow, New Hampshire, United States of America
Updated
22 Jul 2026
Source
Patch

ConstructChat

Ask ConstructChat about Page Road Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Page Road Bridge Replacement” is an infrastructure initiative in the Government sector, located in Bow, New Hampshire, United States. Taiyo aggregates data on it from Patch.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Page Road Bridge Replacement project involves replacing an existing bridge built in 1950 that is currently on the NHDOT Municipal Bridge 'Red List' due to deficiencies. The project is funded by the NHDOT bridge aid program, covering 80% of the costs, while the Town of Bow will cover the remaining 20%.

Budget

Location

Country

United States of America (USA)

State

New Hampshire

City

Bow

Source

Source

Patch

URL

More Details

Record type

Project

Sector

Government, Bridge, Road

Article published date

2025-03-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project