logo
ProjectBidding

Page Road Bridge Replacement

Bidding · New Hampshire · Last reported Nov 2024

Source: Dodge USA

Page Road Bridge Replacement (NHDOT Bridge No. 065/140) The Project includes the following Work: Total removal of the existing metal pipe arch bridge and concrete headwalls (superstructure and substructure), construction of new bridge elements (precast concrete arch units and headwalls, precast concrete pedestal footings, precast concrete wingwalls), bridge rail and approach rail, earthwork, drain

Status
Prospective
Sector
Water Supply and Storage, Bridge, Road, Commercial, Waste Processing and Treatment, Rail, Cement, Metal
Location
Bow, New Hampshire, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Page Road Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Page Road Bridge Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Bow, New Hampshire, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Page Road Bridge Replacement (NHDOT Bridge No. 065/140) The Project includes the following Work: Total removal of the existing metal pipe arch bridge and concrete headwalls (superstructure and substructure), construction of new bridge elements (precast concrete arch units and headwalls, precast concrete pedestal footings, precast concrete wingwalls), bridge rail and approach rail, earthwork, drainage, approach roadway work and paving.

Procurement method

Budget

Location

Country

United States of America (USA)

State

New Hampshire

City

Bow

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Bridge, Road, Commercial, Waste Processing and Treatment, Rail, Cement, Metal

Article published date

2024-12-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project