In 2009, the Bangladesh Power Development Board (PBDB) awarded approximately 14 rental projects under the "quick" rental program which did not require a formal tender, and were unsolicited proposals. The QRPP projects were supposed to add about 1,000 MW of electricity to the national grid. The 50MW Pagla Quick diesel-run rental plant was developed on a fast-track basis at Pagla about 10 kilometers

Status
Prospective
Sector
Power Generation (CCGT), Telecommunications, Government
Location
Bangladesh
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Pagla Quick Rental Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Pagla Quick Rental Power Plant” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Bangladesh. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In 2009, the Bangladesh Power Development Board (PBDB) awarded approximately 14 rental projects under the "quick" rental program which did not require a formal tender, and were unsolicited proposals. The QRPP projects were supposed to add about 1,000 MW of electricity to the national grid. The 50MW Pagla Quick diesel-run rental plant was developed on a fast-track basis at Pagla about 10 kilometers (six miles) from the capital Dhaka. The plant comprised 105 reciprocating engines, each with 0.5 MW of capacity, which will be replaced after 18 months. The project also included installing a 2.5-kilometer 33-kilovolt underground cable to deliver the power to the Shaympur substation. The diesel-run plant came into operation on November 15, 2010, after signing a contract with the PDB in July 15, 2010. DPA Power Generation International. DPA Power was a consortium comprised of the military-controlled Bangladesh Diesel Plant [Government of Bangladesh], Primordial Energy [Bangladesh] and Germany's Aggretech AG [Germany]. The shareholding of the consortium was not known, but the project was listed as "private" as opposed to "public" by PDB. The total project cost estimated at approximately US $11.8 million. This figure was obtained by a formula which assumed a US $600 per kW of installed capacity to obtain a present value of the asset. The per year value of the asset was then obtained by a payment formula that assumed a 10% discount rate and a 15-year asset life. The per year value was then multiplied by the number of years in the rental contract to obtain the final investment figure. This amount was PDB was to purchase electricity from the plant for the next three years at a rate of Tk 13.96 per kilowatt hour (per unit).

Original sector

Energy

Budget

Location

Country

Bangladesh

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Telecommunications, Government

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project