Pains Solar Facility Acquisition
The owner, status and timeline of this project. A free account opens every field.
Source: BIC Magazine
Energea acquired the fully operational 1.3 MW Pains Solar facility located in Minas Gerais, Brazil. The acquisition strengthens Energea's Community Solar portfolio in Brazil, providing immediate cash flow and a projected 15% internal rate of return. The facility uses premium solar technology and is interconnected to the local electricity grid, with long-term rental contracts ensuring stable revenu
- Status
- Closed
- Sector
- Solar, Power Generation (CCGT)
- Location
- Pains, Minas Gerais, Brazil
- Updated
- 22 Jul 2026
- Source
- BIC Magazine
ConstructChat
Ask ConstructChat about Pains Solar Facility Acquisition
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Energea acquired the fully operational 1.3 MW Pains Solar facility located in Minas Gerais, Brazil. The acquisition strengthens Energea's Community Solar portfolio in Brazil, providing immediate cash flow and a projected 15% internal rate of return. The facility uses premium solar technology and is interconnected to the local electricity grid, with long-term rental contracts ensuring stable revenue. |
Original sector | Power Generation |
Budget |
Location
Country | Brazil |
State | Minas Gerais |
City | Pains |
Source
Source | BIC Magazine |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT) |
Article published date | 2025-11-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
