logo

Pajares Tunnel

Sector: Mass Transit • Location: Spain

Source: FCC Construction

Project
Closed

The Pajares Tunnel forms part of the project for the new León - Asturias high-speed line. These tunnels make up the most technically complex operation on the High-Speed line, which forms the connection between Madrid and the principal cities in Castilla y León and those of Asturias. Its construction is intended to cross the Puerto de Pajares massif and it reduces the current journey distance by ra

Project Information FAQ

Project Information

3 Q
The project “Pajares Tunnel” is an infrastructure initiative in the Mass Transit sector, located in Spain. Taiyo aggregates data on it from FCC Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Pajares Tunnel forms part of the project for the new León - Asturias high-speed line. These tunnels make up the most technically complex operation on the High-Speed line, which forms the connection between Madrid and the principal cities in Castilla y León and those of Asturias. Its construction is intended to cross the Puerto de Pajares massif and it reduces the current journey distance by rail between the two slopes of the massif by 34 kilometres.FCC was the successful bidder for Batch 1, which consists of the works required to establish the international width double-track platform for a speed equal to or greater than 300 kilometres per hour, together with the replacement of affected rights of way and services, environmental integration and complementary works.The project entails the execution of two, 24.6 kilometers long tunnels.FCC excavated 15.05 kilometers on the right track and 9.85 kolometers on the left track.The entire tube was made with two single shield, articulated TBMs. This work presented a great technical, engineering and construction challenge, becoming the sixth longest railway tunnel in Europe, the seventh in the world and the second in Spain behind the Guadarrama tunnels.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data