logo

Pajaro River FRM Reaches 6 SOURCES SOUGHT

Sector: Commercial • Location: Watsonville, California, United States of America

Source: Dodge

Project
Closed

This project is for the Reach 6 levee and floodwall construction along the Corralitos Creek, a tributary of the Pajaro River Levee System in the City of Watsonville, County of Santa Cruz. The Project consisting of 2.6 miles of flood risk management levees with approximately 111,600 compacted cubic yards (cy) of fill, and 1,500 ft of floodwalls. The Pajaro FRM Project consists of from Reach 2 to Re

Status
Closed
Sector
Commercial, Manufacturing (Industrial), Water Supply and Storage
Location
Watsonville, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Pajaro River FRM Reaches 6 SOURCES SOUGHT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Pajaro River FRM Reaches 6 SOURCES SOUGHT” is an infrastructure initiative in the Commercial sector, located in Watsonville, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project is for the Reach 6 levee and floodwall construction along the Corralitos Creek, a tributary of the Pajaro River Levee System in the City of Watsonville, County of Santa Cruz. The Project consisting of 2.6 miles of flood risk management levees with approximately 111,600 compacted cubic yards (cy) of fill, and 1,500 ft of floodwalls. The Pajaro FRM Project consists of from Reach 2 to Reach 6 of the Pajaro flood control system. This 1TB is for Reach 6 of the Pajaro FRM Project. The ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Watsonville

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Commercial, Manufacturing (Industrial), Water Supply and Storage

Article published date

2025-04-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project