logo
Project

PAK: ZORLU ENERJI POWER PROJECT

Sector: Power Generation (CCGT) • Location: Pakistan

Source: Asian Development Bank (ADB)

ADB has provided $33.92 million loan to Zorlu Enerji Pakistan Limited (ZEPL), a wholly owned subsidiary of Zorlu Enerji Elektrik retim (the sponsor), to build a landmark wind power project in Sindh Province and increase the country's renewable energy generation capacity. The project, a 56.4 MW wind power plant, was developed in two phases. Phase 1 (6 MW) was constructed through equity financing in

Sector
Power Generation (CCGT), Raw Materials, Oil and Gas, Commercial, Cement, Government, Wind
Location
Pakistan
Updated
22 Jul 2026
Source
Asian Development Bank (ADB)

ConstructChat

Ask ConstructChat about PAK: ZORLU ENERJI POWER PROJECT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “PAK: ZORLU ENERJI POWER PROJECT” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Pakistan. Taiyo aggregates data on it from Asian Development Bank (ADB).

Participants

Sponsoring Agency

Company

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

ADB has provided $33.92 million loan to Zorlu Enerji Pakistan Limited (ZEPL), a wholly owned subsidiary of Zorlu Enerji Elektrik retim (the sponsor), to build a landmark wind power project in Sindh Province and increase the country's renewable energy generation capacity. The project, a 56.4 MW wind power plant, was developed in two phases. Phase 1 (6 MW) was constructed through equity financing in 2009 and Phase 2 (50.4 MW) was constructed with a combination of equity and debt by ADB and other lenders. The power offtaker is Central Power Purchasing Agency (CPPA), under a 20-year take-or-pay Energy Purchase Agreement (EPA). The Government of Pakistan (GOP), acting through Alternate Energy Development Board (AEDB), guarantees CPPA''s obligations under the Implementation Agreement (IA) and bears the wind availability risk. The final project cost slightly increased from $147 million to $152.9 million (primarily on account of USD/Euro fluctuation and IDC). Other financiers included IFC, Eco Trade and Development Bank, and Habib Bank Limited. The Project is the first privately financed wind power project constructed under the Renewable Energy Policy 2006 in Pakistan.

Original sector

Energy

Budget

Location

Country

Pakistan

Source

Source

Asian Development Bank (ADB)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Raw Materials, Oil and Gas, Commercial, Cement, Government, Wind

Article published date

2025-06-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project