Pakistan: Lahore Wastewater and Drainage Management Project
Sector: Water Supply and Storage • Location: Pakistan
Source: Asian Infrastructure Investment Bank (AIIB)
The Project will address the interrelated challenges of wastewater management and urban drainage in central Lahore by building modern wastewater infrastructure to divert sewage from drainage channels and low-lying areas currently contributing to environmental degradation due to the absence of well-connected trunk sewers. This infrastructure will ensure the safe conveyance of wastewater to designat
- Status
- Prospective
- Sector
- Water Supply and Storage, Energy Storage, Power Transmission, Biomass, Solar, Tunnel, Consumer Products, Power Generation (CCGT), Rail, Waste Processing and Treatment, Government, Residential, Road, Commercial
- Location
- Pakistan
- Updated
- 22 Jul 2026
- Source
- Asian Infrastructure Investment Bank (AIIB)
ConstructChat
Ask ConstructChat about Pakistan: Lahore Wastewater and Drainage Management Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project will address the interrelated challenges of wastewater management and urban drainage in central Lahore by building modern wastewater infrastructure to divert sewage from drainage channels and low-lying areas currently contributing to environmental degradation due to the absence of well-connected trunk sewers. This infrastructure will ensure the safe conveyance of wastewater to designated disposal and treatment sites, thus mitigating the discharge of sewage into open waterways, reducing water pollution, addressing public health risks, and improving the urban environment in the surrounding areas. This will be achieved through implementing the following components: Component A. Investment in Wastewater and Drainage Management: This component will invest in the: (i) construction of three modern trunk sewers - with a combined length of about 32.3 kilometers (km) through underground tunneling using trenchless techniques and gravity-based conveyance; (ii) construction of a new pumping station consisting of 16 pumps increasing the total pumping capacity from the existing 15,300 liters per second (lps) to 39,300 lps; (iii) rehabilitation of about 7 km of surface drains to alleviate urban flooding in central Lahore, while also diverting sewage to free nearly 9 km of local surface drains from wastewater discharge; and (iv) clean energy support for wastewater disposal pumps through solar energy installation. Construction of the new trunk sewers will allow decommissioning of old pumping stations which will significantly reduce the operating costs of the Lahore Water and Sanitation Agency (LWASA). Component B. Project Management: This component will support LWASA to engage a Project Management Consultant (PMC) for design review, procurement of works and goods, and overall project management including construction supervision, managing environmental and social compliances, and ensuring quality assurance during construction. |
Original sector | Water |
Budget |
Location
Country | Pakistan |
Source
Source | Asian Infrastructure Investment Bank (AIIB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Energy Storage, Power Transmission, Biomass, Solar, Tunnel, Consumer Products, Power Generation (CCGT), Rail, Waste Processing and Treatment, Government, Residential, Road, Commercial |
Article published date | 2025-12-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
