logo

Pakistan: Lahore Wastewater and Drainage Management Project

Sector: Water Supply and Storage • Location: Pakistan

Source: Asian Infrastructure Investment Bank (AIIB)

Project
Approved

The Project will address the interrelated challenges of wastewater management and urban drainage in central Lahore by building modern wastewater infrastructure to divert sewage from drainage channels and low-lying areas currently contributing to environmental degradation due to the absence of well-connected trunk sewers. This infrastructure will ensure the safe conveyance of wastewater to designat

Project Information FAQ

Project Information

5 Q
The project “Pakistan: Lahore Wastewater and Drainage Management Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Pakistan. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

approved

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project will address the interrelated challenges of wastewater management and urban drainage in central Lahore by building modern wastewater infrastructure to divert sewage from drainage channels and low-lying areas currently contributing to environmental degradation due to the absence of well-connected trunk sewers. This infrastructure will ensure the safe conveyance of wastewater to designated disposal and treatment sites, thus mitigating the discharge of sewage into open waterways, reducing water pollution, addressing public health risks, and improving the urban environment in the surrounding areas. This will be achieved through implementing the following components: Component A. Investment in Wastewater and Drainage Management: This component will invest in the: (i)  construction of three modern trunk sewers - with a combined length of about 32.3 kilometers (km) through underground tunneling using trenchless techniques and gravity-based conveyance; (ii) construction of a new pumping station consisting of 16 pumps increasing the total pumping capacity from the existing 15,300 liters per second (lps) to 39,300 lps; (iii) rehabilitation of about 7 km of surface drains to alleviate urban flooding in central Lahore, while also diverting sewage to free nearly 9 km of local surface drains from wastewater discharge; and (iv) clean energy support for wastewater disposal pumps through solar energy installation. Construction of the new trunk sewers will allow decommissioning of old pumping stations which will significantly reduce the operating costs of the Lahore Water and Sanitation Agency (LWASA). Component B. Project Management: This component will support LWASA to engage a Project Management Consultant (PMC) for design review, procurement of works and goods, and overall project management including construction supervision, managing environmental and social compliances, and ensuring quality assurance during construction.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data