logo

Pakistan: Lahore Water and Wastewater Management

Sector: Waste Processing and Treatment • Location: Pakistan

Source: Asian Infrastructure Investment Bank (AIIB)

Project
Proposed

The Project consists of the following components:Component One: Investment for safe water supply infrastructure, which will comprise the construction of a diversion structure for the surface water from BRBD Canal and associated SWTP, rehabilitation/replacement of leaking pipes and pumping machinery, and installation of bulk and consumer water meters. The total capacity of the SWTP will be 245,000

Project Information FAQ

Project Information

5 Q
The project “Pakistan: Lahore Water and Wastewater Management” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Pakistan. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

proposed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project consists of the following components:Component One: Investment for safe water supply infrastructure, which will comprise the construction of a diversion structure for the surface water from BRBD Canal and associated SWTP, rehabilitation/replacement of leaking pipes and pumping machinery, and installation of bulk and consumer water meters. The total capacity of the SWTP will be 245,000 m3/day or 53.8 MGD. This component will also ensure that 100 percent schools/colleges in Lahore are connected with safe drinking water facility.Component Two: Investment for safe sanitation infrastructure, will include the construction of three WWTPs at the locations of Mahmood Booti, Shadbagh, and Shahdara; rehabilitation/replacement of inefficient wastewater pumping stations and selected sewer lines; and the construction of main trunk sewers to be connected with the new WWTPs. The proposed WWTPs will treat the wastewater from North and Northwest areas of Lahore. The plants will be fed by disposal stations located at Shadi Pura,Bhogiwal, Khokhar, Shadbagh, Shahdara and Farkhabad; and by drainage stations at Mehmood Booti and Siddique Pura through trunk sewers fed by secondary and tertiary sewerage networks.Component 3: Technical Support for Institutional Performance Improvement, and Project Construction Supervision. The LWASA will appoint Project Management Consultant (PMC) for the execution of activities relating to (a) institutional performance improvement; and (b) project construction supervision support.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data