Pakistan: Lahore Water and Wastewater Management
Sector: Water Supply and Storage • Location: Pakistan
Source: Asian Infrastructure Investment Bank (AIIB)
The Project consists of the following components:Component One: Investment for safe water supply infrastructure, which will comprise the construction of a diversion structure for the surface water from BRBD Canal and associated SWTP, rehabilitation/replacement of leaking pipes and pumping machinery, and installation of bulk and consumer water meters. The total capacity of the SWTP will be 245,000
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | proposed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Project consists of the following components:Component One: Investment for safe water supply infrastructure, which will comprise the construction of a diversion structure for the surface water from BRBD Canal and associated SWTP, rehabilitation/replacement of leaking pipes and pumping machinery, and installation of bulk and consumer water meters. The total capacity of the SWTP will be 245,000 m3/day or 53.8 MGD. This component will also ensure that 100 percent schools/colleges in Lahore are connected with safe drinking water facility.Component Two: Investment for safe sanitation infrastructure, will include the construction of three WWTPs at the locations of Mahmood Booti, Shadbagh, and Shahdara; rehabilitation/replacement of inefficient wastewater pumping stations and selected sewer lines; and the construction of main trunk sewers to be connected with the new WWTPs. The proposed WWTPs will treat the wastewater from North and Northwest areas of Lahore. The plants will be fed by disposal stations located at Shadi Pura,Bhogiwal, Khokhar, Shadbagh, Shahdara and Farkhabad; and by drainage stations at Mehmood Booti and Siddique Pura through trunk sewers fed by secondary and tertiary sewerage networks.Component 3: Technical Support for Institutional Performance Improvement, and Project Construction Supervision. The LWASA will appoint Project Management Consultant (PMC) for the execution of activities relating to (a) institutional performance improvement; and (b) project construction supervision support. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
