The Super Highway will connect Hyderabad with Karachi. Karachi port and harbour aerial view. The project was awarded to a Malaysian company, Bina Puri Holdings, in January 2012. Map of Pakistan's road network. The Super Highway is a national highway in Pakistan, connecting Karachi with Hyderabad. Located in the Sindh province of Pakistan, the highway will be converted into a six-lane motorway at a

Project Information FAQ

Project Information

4 Q
The project “Pakistan Super Highway M-9 Project” is an infrastructure initiative in the Commercial sector, located in Thailand. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Super Highway will connect Hyderabad with Karachi. Karachi port and harbour aerial view. The project was awarded to a Malaysian company, Bina Puri Holdings, in January 2012. Map of Pakistan's road network. The Super Highway is a national highway in Pakistan, connecting Karachi with Hyderabad. Located in the Sindh province of Pakistan, the highway will be converted into a six-lane motorway at a cost of approximately PKR 9bn. Also known as M-9, the proposed motorway will be 136km long and will be constructed on a build-operate-transfer (BOT) basis. The project, worth PKR 24.93bn, was awarded to a Malaysian company, Bina Puri Holdings, in January 2012. Once completed, the highway would connect the Karachi port with vital cities around the South Asian country. The project received government approval in April 2009. The motorway project launch was originally scheduled for 2006. It experienced delays as the contractor, M/s Standard Company, was blacklisted by the NHA for submitting fake bank surety. To prohibit the NHA from awarding the project to another contractor, the M/s Standard Company also got a stay order from the court. The stay order was vacated and NHA undertook the pre-qualification process. The existing four-lane superhighway begins from the end of Mohammad Ali Jinnah Road, located at the north side of Karachi. A trumpet interchange links the highway at the start with the Karachi Northern Bypass. When out of Karachi, the highway continues on a northeast track before forming a junction with the national highway N-5. Via a link road, the motorway merges with N-5 after Hyderabad in the suburban town of Kotri at a cloverleaf interchange. The four-lane superhighway will be converted into a six-lane motorway over a span of two years. Designed to be equipped with all the modern facilities, the motorway will comprise 11 interchanges, ten pedestrian underpasses and 12 sets of toll booths. Six weighing stations and two service areas will be constructed as part of the motorway. The motorway will be designed to be water-protective. The project will also oversee the reconstruction of a 20km-long section of the highway. The section will be re-constructed according to the requirements of M-9. It received PKR 300m in funds from the federal communications minister. The work is expected to start in early 2012 and will be completed in three years. It will include seven interchanges, two service areas and 16 toll plazas. The motorway will be built in four packages. Package one will oversee the construction of the motorway from zero kilometres to km 16+200. Packages two and three will take care of the construction of the motorway from km 16+200 to km 55+500. Construction of the motorway from km 55+500 to km 95+500 will be undertaken in packages four and five while the last stretch, extending from km 95-500 to km 134+350, will be constructed as part of package numbers six and seven. The motorway will be built in the BOT model. Before transferring it to the Pakistan National Highway Authority (NHA), the chosen construction company will operate the motorway for a period of 28 years. During this time, NHA will receive 30% of the revenues with the remaining revenues going to the construction company. Bina Puri Holdings won the contract for constructing Karachi-Hyderabad motorway in January 2012. The NHA had invited for open competition amongst the interested companies for the construction. Several companies, including NLC, Bina Puri Holdings Malaysia, EOBI, SAMBO, CRBC China and a Turkish company submitted their proposals. The contract was awarded to Bina Puri Holdings after elaborated financial and technical evaluation. Founded in 1991, the National Highway Authority of Pakistan is a government-appointed body which monitors and controls the development and maintenance of Pakistan’s national highways. The NHA controls nearly 8,780km of federalised roads, which represent 3% of the total road network and 75% of the road traffic in Pakistan. N-5 is Pakistan’s longest and the most important national highway. It passes through Punjab, Sindh and the North-West Frontier Province (NWFP). Measuring a length of 1,819km, with 1,021km in Punjab, 671km in Sindh and 127km in the NWFP, N-5 forms junctions with several highways including M-1, N-55, N-45, N-35, N-75, M-2, M-4, N-70 and M-9.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data