Pala Road Resurfacing
Sector: Cement • Location: California, United States of America
Source: Riverside County
Limits: 105 feet Southerly of Pechanga Road to County of San Diego Line Length: Approximately 1.7 miles District: 3 Community: Wolf Valley
The County of Riverside Transportation Department is proposing to resurface approximately 1.7 miles of Pala Road from 105 feet Southerly of Pechanga Road to County of San Diego Line. Pala Road is classified as a Collector in the County of Riversides General P
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Limits: 105 feet Southerly of Pechanga Road to County of San Diego Line Length: Approximately 1.7 miles District: 3 Community: Wolf Valley The County of Riverside Transportation Department is proposing to resurface approximately 1.7 miles of Pala Road from 105 feet Southerly of Pechanga Road to County of San Diego Line. Pala Road is classified as a Collector in the County of Riversides General Plan. Pala Road is a two to lane road and currently ranges from 24-34 feet wide with dike along various segments of the roadway. The proposed project will include pulverizing the roadway followed by overlaying with Hot Mix Asphalt (HMA). Additional improvements include: Full depth reconstruction along portions of Pala Road Construction of asphalt concrete dike and driveways Reconstruction of asphalt concrete and concrete driveways Placement of safety edge and shoulder backing Replacement of culverts Installation of guardrail and traffic detector loops Minor paved shoulder widening Utility/facility adjustments Striping of roadway, including pavement markers and reflectors Salvage/removal and installation of new signs No additional right-of-way, permits to enter and construct (PEC), or temporary construction easements (TCE) will be required to construct the proposed improvements. The project improvements will not be within the existing footprint of the roadway and will raise the existing roadway profile by 0.40 in the overlay areas. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
