logo

Palambo Multi-purpose Dam

Sector: Automotive • Location: World

Source: Programme for Infrastructure Development in Africa (PIDA)

Project
Active

The project aims to provide solutions to the problems of interruption of navigation on Oubangui River, tributary of the Congo River in the region of Central Africa. This is particularly the case during periods of low water levels, and the supply of electricity to the Central African Republic (CAR), North Congo and the Congo. DRC, through the construction of a Oubangui flow control and power genera

Project Information FAQ

Project Information

5 Q
The project “Palambo Multi-purpose Dam” is an infrastructure initiative in the Automotive sector, located in World. Taiyo aggregates data on it from Programme for Infrastructure Development in Africa (PIDA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project aims to provide solutions to the problems of interruption of navigation on Oubangui River, tributary of the Congo River in the region of Central Africa. This is particularly the case during periods of low water levels, and the supply of electricity to the Central African Republic (CAR), North Congo and the Congo. DRC, through the construction of a Oubangui flow control and power generation dam at the Palambo site, is about 60 km upstream from Bangui. The characteristics of the scenario chosen among the solutions proposed by SOGREAH in 1990 were as follows: Normal retention rating of 361 m; Height of the dam of approximately 18 m; Area of 606 x106 m 2; Length of approximately 1,200 m; Minimum downstream flow to reach at Zinga, about 70 km downstream from Bangui of 920 m3 / s; Storage volume of 2,370 million m3; Power generation of 30 MW; Number of groups of 4 bulbs (unit flow: 94 m3 / s).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data