logo

Palazzo Verdi Office Tower

Sector: Car parking • Location: United States of America (USA)

Source: Kiewit Construction

Project
Completed

Kiewit was selected to provide CM/GC, design/assist services for this $60 million, 422,000 SF, Class A, 15-story office tower, including a museum, café and parking garage. Signature elements of the project include precast and stone cladding with extensive interior stone finishes, a main lobby that is in excess of 40 feet tall, and a lobby atrium that features three pieces of permanent art – a chan

Project Information FAQ

Project Information

5 Q
The project “Palazzo Verdi Office Tower” is an infrastructure initiative in the Car parking sector, located in United States of America (USA). Taiyo aggregates data on it from Kiewit Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Kiewit was selected to provide CM/GC, design/assist services for this $60 million, 422,000 SF, Class A, 15-story office tower, including a museum, café and parking garage. Signature elements of the project include precast and stone cladding with extensive interior stone finishes, a main lobby that is in excess of 40 feet tall, and a lobby atrium that features three pieces of permanent art – a chandelier, a painting and the lobby floor itself. The parking structure consisted of the addition of 165 parking stalls to the existing 1,524 stalls. The addition is precast structured parking sandwiched between ten levels of offices above, and an art gallery and restaurant below. The Maddens’ personal art collection is displayed in the 11,000 SF gallery, along with various visiting exhibits. This project utilized a fast-track, design-assist delivery system that accommodated completing the first construction documents in less than six months from the initial project meeting. The project is LEED Gold certified.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data