Palkowski Road Crossing Replacement on Danuser Creek
Sector: Road • Location: Wisconsin, United States
Source: ArcGIS StoryMaps
This project reconnected aquatic habitats for approximately 4.5 miles of perennial stream in a Class 2 trout stream hosting brook and brown trout. It involved removing two undersized metal culverts and replacing them with a span bridge to improve natural hydrologic flow, reduce flooding frequency, and decrease stream erosion at the crossing.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project reconnected aquatic habitats for approximately 4.5 miles of perennial stream in a Class 2 trout stream hosting brook and brown trout. It involved removing two undersized metal culverts and replacing them with a span bridge to improve natural hydrologic flow, reduce flooding frequency, and decrease stream erosion at the crossing. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
