Palm River Energy Project
One of 1,535 projects Taiyo tracks in Zimbabwe.
Source: The Chronicle - Breaking news
The Palm River Energy Metallurgical Special Economic Zone project in Beitbridge aims to generate US$1.7 billion by 2030, contributing to Zimbabwe's Vision 2030 goal of becoming an upper-middle-income economy. The project includes significant production targets for ferrochrome, coking coal, power, and carbon steel.
- Status
- Under Construction
- Sector
- Steel, Manufacturing (Industrial), Power Generation (CCGT), Metal
- Location
- Zimbabwe
- Updated
- 22 Jul 2026
- Source
- The Chronicle - Breaking news
ConstructChat
Ask ConstructChat about Palm River Energy Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Palm River Energy Metallurgical Special Economic Zone project in Beitbridge aims to generate US$1.7 billion by 2030, contributing to Zimbabwe's Vision 2030 goal of becoming an upper-middle-income economy. The project includes significant production targets for ferrochrome, coking coal, power, and carbon steel. |
Original sector | Energy and Mining |
Budget |
Location
Country | Zimbabwe |
Source
Source | The Chronicle - Breaking news |
URL |
More Details
Record type | Project |
Sector | Steel, Manufacturing (Industrial), Power Generation (CCGT), Metal |
Article published date | 2025-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in Zimbabwe
- MATTER Career Readiness Institute / Joel Daniel Pringle + Architectural & Planning Studio
- Palm River Energy Metallurgical Special Economic Zone
- Palm River Energy Metallurgical Industrial Park
- ZISCO STEEL REHAB
- Post-Cyclone Idai Emergency Power Restoration Project in Manicaland
- Construction of Four New Units at Hwange Power Station
- Revival of Zimbabwe Iron and Steel Company (Zisco)
- Rehabilitation of Hwange Thermal Power Station
