logo

Palm River Public Utilities Renewal Area 4

Sector: Water Supply and Storage • Location: Naples, Florida, United States of America

Source: Dodge USA

Project
Closed

This project consists of replacing the aging potable water main, installing a central wastewater collection system, and abandoning the existing septic systems within Cocohatchee River Estates (Area 4). The Cocohatchee River Estates is 24-lot community on the west side of the Palm River neighborhood along Cocohatchee Boulevard and Cocohatchee Drive. The project generally consists of the following m

Status
Closed
Sector
Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT)
Location
Naples, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Palm River Public Utilities Renewal Area 4

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Palm River Public Utilities Renewal Area 4” is an infrastructure initiative in the Water Supply and Storage sector, located in Naples, Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project consists of replacing the aging potable water main, installing a central wastewater collection system, and abandoning the existing septic systems within Cocohatchee River Estates (Area 4). The Cocohatchee River Estates is 24-lot community on the west side of the Palm River neighborhood along Cocohatchee Boulevard and Cocohatchee Drive. The project generally consists of the following major components: Potable Water Infrastructure Improvements o Installation of new 8-inch and 10-in...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Naples

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT)

Article published date

2024-06-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project