logo
ProjectEnded

PALMAS PORT SPHINX DIKE PHASE IV

The status, timeline and source of this project. A free account opens every field.

Source: EU Funding & Tenders Portal

The Project is located in the Africa basin in the port of Las Palmas, in the outermost region of Canary Islands (Spain), which belongs to the Core Network. The Project is included in the priority of Projects on the Core Network (Maritime Ports). The Africa basin is protected by the Sphinx dike Phase III, where are handled Ro-Ro cargo, ferry passengers and oil products. However, it suffers disturba

Status
Closed
Sector
Oil and Gas, Seaport, Government, Road
Location
Spain
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about PALMAS PORT SPHINX DIKE PHASE IV

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “PALMAS PORT SPHINX DIKE PHASE IV” is an infrastructure initiative in the Oil and Gas sector, located in Spain. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Sponsoring Agency

Status

Original status

ended

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project is located in the Africa basin in the port of Las Palmas, in the outermost region of Canary Islands (Spain), which belongs to the Core Network. The Project is included in the priority of Projects on the Core Network (Maritime Ports). The Africa basin is protected by the Sphinx dike Phase III, where are handled Ro-Ro cargo, ferry passengers and oil products. However, it suffers disturbances of waves and resonance episodes. It makes difficult or directly, impossible, to load/unload passengers and goods in some periods of the year. In addition, this basin cannot handle VLCC vessels, which means a loss of competitiveness for the port in the oil products traffic. To improve this situation, the APLP is aiming to enlarge the Sphinx Dike, executing the Phase IV (238,5m), which will increase the shelter conditions and provide additional berthing line. Consequently, the main objectives of the Project are: -Remove the disturbances of waves and resonance episodes, which suppose a bottleneck by the lack of operability in the basin. -Increase the berthing capacity of the Africa basin, allowing to attend VLCC vessels, mainly for refined products. -Ensure and enhance the maritime accessibility and connectivity between the Canary Islands and mainland of Spain. -Promote the economically and efficient liquid bulk transport in VLCC vessels, with significant transport costs savings, contributing to the development of the Canary Islands. -Efficient use of new/existing infrastructure, taking advantage of the caissons of the Sphinx dike Phase III. -Contribute to the sustainable development, reducing external costs of transport. -Ensure and enhance safe standards for passenger and freight transport. The Project is considered a project of common interest according to the TEN-T Guidelines as it contributes to the development of TEN-T networks (creation of new transport infrastructure and promote the resource-efficient use of the network) and is fully in line with the objectives of the call.

Location

Country

Spain

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Oil and Gas, Seaport, Government, Road

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project