logo

Palmeiras de Goias Thermal Power Plant

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

The Brazilian company Engebra – Empresa de Energia do Brasil Ltda was granted an authorization to build and operate an oil fueled power plant located in the state of Goias (174.3 MW in total capacity). The 35-year contract was signed with the regulatory agency ANEEL in September 2007. Engebra created a special purpose company named Usina Termelétrica Palmeiras de Goias Ltda to lead the project.

I

Project Information FAQ

Project Information

5 Q
The project “Palmeiras de Goias Thermal Power Plant” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Brazilian company Engebra – Empresa de Energia do Brasil Ltda was granted an authorization to build and operate an oil fueled power plant located in the state of Goias (174.3 MW in total capacity). The 35-year contract was signed with the regulatory agency ANEEL in September 2007. Engebra created a special purpose company named Usina Termelétrica Palmeiras de Goias Ltda to lead the project. In 2006, Usina Termeletrica Palmeiras de Goias Ltda took part in a competitive bidding process and won the right to supply 69 MW of electricity on average to the regulated market starting in 2011. In January 2011, Engebra sold its shares on Usina Termeletrica Palmeiras de Goias to Bolognesi Participacoes S.A. The sponsor committed to invest US$ 162.3 million (BRL 273 million) in the construction of the power plant. Construction works started in the end of March 2011 and were concluded in October of the same year. Commercial operations commenced in July 2012.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data