Palmeiras de Goias Thermal Power Plant

Active · Brazil

Source: World Bank Group

Project
Active

The Brazilian company Engebra – Empresa de Energia do Brasil Ltda was granted an authorization to build and operate an oil fueled power plant located in the state of Goias (174.3 MW in total capacity). The 35-year contract was signed with the regulatory agency ANEEL in September 2007. Engebra created a special purpose company named Usina Termelétrica Palmeiras de Goias Ltda to lead the project.

I

Status
Prospective
Sector
Geothermal, Oil and Gas, Power Generation (CCGT), Government, Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Palmeiras de Goias Thermal Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Palmeiras de Goias Thermal Power Plant” is an infrastructure initiative in the Geothermal sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brazilian company Engebra – Empresa de Energia do Brasil Ltda was granted an authorization to build and operate an oil fueled power plant located in the state of Goias (174.3 MW in total capacity). The 35-year contract was signed with the regulatory agency ANEEL in September 2007. Engebra created a special purpose company named Usina Termelétrica Palmeiras de Goias Ltda to lead the project. In 2006, Usina Termeletrica Palmeiras de Goias Ltda took part in a competitive bidding process and won the right to supply 69 MW of electricity on average to the regulated market starting in 2011. In January 2011, Engebra sold its shares on Usina Termeletrica Palmeiras de Goias to Bolognesi Participacoes S.A. The sponsor committed to invest US$ 162.3 million (BRL 273 million) in the construction of the power plant. Construction works started in the end of March 2011 and were concluded in October of the same year. Commercial operations commenced in July 2012.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Geothermal, Oil and Gas, Power Generation (CCGT), Government, Commercial

Article published date

2024-10-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project