Palmer Headworks Rehabilitation
Sector: Water Supply and Storage • Location: Palmer, Alaska, United States of America
Source: Dodge
Design and install a preliminary grit separator before the headworks building. This would allow for access to every part of the building, including lighting and machinery. The screw pumps and augers would then be replaced to handle daily flows independently. An emergency backup pump would also be installed in the influent basin to prevent any flooding of the plant and the gantry cranes would be re
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Commercial
- Location
- Palmer, Alaska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Palmer Headworks Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Design and install a preliminary grit separator before the headworks building. This would allow for access to every part of the building, including lighting and machinery. The screw pumps and augers would then be replaced to handle daily flows independently. An emergency backup pump would also be installed in the influent basin to prevent any flooding of the plant and the gantry cranes would be reconfigured to allow better access when removing or installing large machinery City of Palmer may ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alaska |
City | Palmer |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
