logo

Palmer Solar Farm

Sector: Solar • Location: Colorado, United States

Source: PIRG

Project
Completed

Solar farm with 220,750 modules on 700 acres in El Paso County. It became operational in 2020 and produces 60 MW of renewable energy, powering around 19,000 homes per year.

Status
Closed
Sector
Solar, Raw Materials
Location
Colorado, United States of America
Updated
22 Jul 2026
Source
PIRG

ConstructChat

Ask ConstructChat about Palmer Solar Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Palmer Solar Farm” is an infrastructure initiative in the Solar sector, located in Colorado, United States. Taiyo aggregates data on it from PIRG.

Participants

Not available for this record.

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Solar farm with 220,750 modules on 700 acres in El Paso County. It became operational in 2020 and produces 60 MW of renewable energy, powering around 19,000 homes per year.

Original sector

Energy

Location

Country

United States of America (USA)

State

Colorado

Source

Source

PIRG

URL

More Details

Record type

Project

Sector

Solar, Raw Materials

Article published date

2025-05-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project