logo
ProjectBid Results

Palmer Water System Improvements - Section 2

Bid results · Iowa · Last reported Jun 2025

Source: Dodge

Section 2 - Water Tower - (April 30, 2026 Substantial Completion) 1. Demolition of water tower roof and the top 3-feet of shell plate. 2. Installation of a temporary pressurized water system. 3. Contractor is responsible for providing calculations for complete structural loadings and connections. 4. Completion of structure modifications including the replacement of the roof in its entirety and the

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
Location
Palmer, Iowa, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Palmer Water System Improvements - Section 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Palmer Water System Improvements - Section 2” is an infrastructure initiative in the Water Supply and Storage sector, located in Palmer, Iowa, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Section 2 - Water Tower - (April 30, 2026 Substantial Completion) 1. Demolition of water tower roof and the top 3-feet of shell plate. 2. Installation of a temporary pressurized water system. 3. Contractor is responsible for providing calculations for complete structural loadings and connections. 4. Completion of structure modifications including the replacement of the roof in its entirety and the top 3-feet of shell plate. 5. Completion of surface repairs equivalent to 50 man-hours. 6. Compl...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Iowa

City

Palmer

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government, Commercial

Article published date

2025-07-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project