Palmer Water System Improvements - Section 2
Sector: Water Supply and Storage • Location: Palmer, Iowa, United States of America
Source: Dodge
Section 2 - Water Tower - (April 30, 2026 Substantial Completion) 1. Demolition of water tower roof and the top 3-feet of shell plate. 2. Installation of a temporary pressurized water system. 3. Contractor is responsible for providing calculations for complete structural loadings and connections. 4. Completion of structure modifications including the replacement of the roof in its entirety and the
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | bid results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Section 2 - Water Tower - (April 30, 2026 Substantial Completion) 1. Demolition of water tower roof and the top 3-feet of shell plate. 2. Installation of a temporary pressurized water system. 3. Contractor is responsible for providing calculations for complete structural loadings and connections. 4. Completion of structure modifications including the replacement of the roof in its entirety and the top 3-feet of shell plate. 5. Completion of surface repairs equivalent to 50 man-hours. 6. Compl... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
