logo

Palmer Wind Farm

Sector: Power Generation (CCGT) • Location: South Australia, Australia

Source: Power Technology

Project
Planned

The Palmer Wind Farm, located 50km east of Adelaide, will feature 40 wind turbines with a maximum tip height of 220m and a total generating capacity of 288MW. It aims to provide enough clean energy to power 142,000 homes until 2054, while also contributing to significant reductions in greenhouse gas emissions.

Status
Prospective
Sector
Power Generation (CCGT), Raw Materials, Wind
Location
South Australia, Australia
Updated
22 Jul 2026
Source
Power Technology

ConstructChat

Ask ConstructChat about Palmer Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Palmer Wind Farm” is an infrastructure initiative in the Power Generation (CCGT) sector, located in South Australia, Australia. Taiyo aggregates data on it from Power Technology.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Palmer Wind Farm, located 50km east of Adelaide, will feature 40 wind turbines with a maximum tip height of 220m and a total generating capacity of 288MW. It aims to provide enough clean energy to power 142,000 homes until 2054, while also contributing to significant reductions in greenhouse gas emissions.

Original sector

Energy

Budget

Location

Country

Australia

State

South Australia

Source

Source

Power Technology

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Raw Materials, Wind

Article published date

2025-03-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project