Palmetto Ct & Headwater Dr Concrete Panel & Crub Replacement
Closed · Louisiana · Last reported Mar 2024
Source: Dodge USA
The Parish requires the Contractor to improve the roadway by removing, replacing, and repairing concrete panels and curbs along Palmetto Ct. R09A057 Section 18, Township 8S, Range 14E, and Headwaters Dr. R09A019 Section 19, Township 8S, Range 14E, located in Slidell, Louisiana
- Status
- Closed
- Sector
- Cement, Car parking, Automotive, Government, Commercial
- Location
- Slidell, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Palmetto Ct & Headwater Dr Concrete Panel & Crub Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Parish requires the Contractor to improve the roadway by removing, replacing, and repairing concrete panels and curbs along Palmetto Ct. R09A057 Section 18, Township 8S, Range 14E, and Headwaters Dr. R09A019 Section 19, Township 8S, Range 14E, located in Slidell, Louisiana |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | Slidell |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Car parking, Automotive, Government, Commercial |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
