PALMETTO ELEMENTARY SCHOOL - SRTS
Sector: Car parking • Location: Palmetto, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The proposed improvements include the construction of four new crosswalks; one on Cascade Palmetto Highway (SR 154) and three raised crosswalks (Fulton County Type 2 speed tables) on Carlton Road with installation of sidewalks and curb and gutter on the north side of Carlton Road between Palmetto Elementary School and Cascade Palmetto Hwy to the east and Brentwood Drive to the west of Palmetto Ele
- Status
- Closed
- Sector
- Car parking, Road, Government, Automotive, Waste Processing and Treatment
- Location
- Palmetto, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about PALMETTO ELEMENTARY SCHOOL - SRTS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed improvements include the construction of four new crosswalks; one on Cascade Palmetto Highway (SR 154) and three raised crosswalks (Fulton County Type 2 speed tables) on Carlton Road with installation of sidewalks and curb and gutter on the north side of Carlton Road between Palmetto Elementary School and Cascade Palmetto Hwy to the east and Brentwood Drive to the west of Palmetto Elementary School excluding the existing sidewalk in front of the school. Drainage systems are also proposed to minimize runoff spread rates along the proposed curb and gutter sections. This project is part of the Georgia Safe Routes to Schools (SRTS) Program. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Palmetto |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Government, Automotive, Waste Processing and Treatment |
Article published date | 2024-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
