logo

Palo Alto Wind Farm

Sector: Wind • Location: Mexico

Source: World Bank Group

Project
Active

The Italian group Enel Green Power, through its Mexican renewable energy subsidiary Enel Green Power México (EGPM), announced the development of the Palo Alto Wind Farm, located at Jalisco state (129 MW in capacity).

In 2015, the sponsor signed a long-term power purchase agreement with the state-owned power utility CFE.

The investment was estimated at US$ 250 million fully funded with the spons

Status
Prospective
Sector
Wind, Raw Materials, Power Generation (CCGT), Government, Power Transmission, Commercial
Location
Mexico
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Palo Alto Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Palo Alto Wind Farm” is an infrastructure initiative in the Wind sector, located in Mexico. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Italian group Enel Green Power, through its Mexican renewable energy subsidiary Enel Green Power México (EGPM), announced the development of the Palo Alto Wind Farm, located at Jalisco state (129 MW in capacity). In 2015, the sponsor signed a long-term power purchase agreement with the state-owned power utility CFE. The investment was estimated at US$ 250 million fully funded with the sponsor’s equity. The special purpose company Energia Limpia de Palo Alto S. de R.L. de C.V. was created to manage the project. An EPC contract was signed with the Spanish company Transbiaga. Commercial operations began in November 2016.

Original sector

Energy

Budget

Location

Country

Mexico

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Wind, Raw Materials, Power Generation (CCGT), Government, Power Transmission, Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project