Pamir Energy Development
Sector: Water Supply and Storage • Location: Tajikistan
Source: IFC Project Disclosures
The project is the rehabilitation, upgrading, and operation of existing power generation, transmission and distribution facilities in Gorno Badakhshan Autonomous Oblast (GBAO), Tajikistan -- currently operated by the national electrical utility Barki Tajik -- for a period of 25 years. The basic project concept was developed by IFC in conjunction with the Aga Khan Fund for Economic Development (AK
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Transmission, Hydro, Power Generation (CCGT), Commercial
- Location
- Tajikistan
- Updated
- 19 Nov 2026
- Source
- IFC Project Disclosures
ConstructChat
Ask ConstructChat about Pamir Energy Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project is the rehabilitation, upgrading, and operation of existing power generation, transmission and distribution facilities in Gorno Badakhshan Autonomous Oblast (GBAO), Tajikistan -- currently operated by the national electrical utility Barki Tajik -- for a period of 25 years. The basic project concept was developed by IFC in conjunction with the Aga Khan Fund for Economic Development (AKFED), which will be the controlling shareholder. Technical, economic, and environmental studies for the project were undertaken by Electrowatt-Ekono of Zurich, funded under IFC Swiss trust funds.The cornerstone of the project is the completion of the Pamir I run-of-river hydroelectric plant near Khorog, the administrative capital of GBAO, by installing two additional turbines to bring the installed capacity of the plant to the planned total of 28 MW; and building a regulating structure at Lake Yashilkul – the source of the Gunt River that powers the Pamir I plant – to allow release of additional water during the winter to ensure sufficient water flows for energy production. The Pamir I plant was largely constructed in the 1980s and the first two of four planned units were put into service in 1996. |
Original sector | BA - Large Hydro - Renewable Energy Generation |
Location
Country | Tajikistan |
Source
Source | IFC Project Disclosures |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Hydro, Power Generation (CCGT), Commercial |
Article published date | 2026-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Tajikistan
- Sangtuda 2 Hydropower Plant
- PamirEnergy
- Tajikistan: Obigarm-Nurobod Road Project - Long Bridge and Approaches
- Enhancing Sustainability: Financing for the Rogun Hydropower Project
- Yavan Water
- Tajikistan: Nurek Hydropower Rehabilitation, Phase I
- Water Resources Management in Pyanj River Basin Project
- Central Asia Regional Economic Cooperation Corridors 2, 5, and 6 (Dushanbe–Kurgonteppa) Road Project