Pamir Energy Development
Sector: Water Supply and Storage • Location: Tajikistan
Source: International Finance Corporation (IFC)
The project is the rehabilitation, upgrading, and operation of existing power generation, transmission and distribution facilities in Gorno Badakhshan Autonomous Oblast (GBAO), Tajikistan -- currently operated by the national electrical utility Barki Tajik -- for a period of 25 years. The basic project concept was developed by IFC in conjunction with the Aga Khan Fund for Economic Development (AK
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project is the rehabilitation, upgrading, and operation of existing power generation, transmission and distribution facilities in Gorno Badakhshan Autonomous Oblast (GBAO), Tajikistan -- currently operated by the national electrical utility Barki Tajik -- for a period of 25 years. The basic project concept was developed by IFC in conjunction with the Aga Khan Fund for Economic Development (AKFED), which will be the controlling shareholder. Technical, economic, and environmental studies for the project were undertaken by Electrowatt-Ekono of Zurich, funded under IFC Swiss trust funds.The cornerstone of the project is the completion of the Pamir I run-of-river hydroelectric plant near Khorog, the administrative capital of GBAO, by installing two additional turbines to bring the installed capacity of the plant to the planned total of 28 MW; and building a regulating structure at Lake Yashilkul – the source of the Gunt River that powers the Pamir I plant – to allow release of additional water during the winter to ensure sufficient water flows for energy production. The Pamir I plant was largely constructed in the 1980s and the first two of four planned units were put into service in 1996. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in Tajikistan
- PamirEnergy
- Sangtuda 2 Hydropower Plant
- Managing Glacier Loss and Water Security Project
- Tajikistan: Rogun Hydropower Development Project - Phase 1
- Tajikistan: Rogun Hydropower Development Project - Phase 1
- Tajikistan: Rogun Hydropower Development Project - Phase 1
- Tajikistan: Rogun Hydropower Development Project - Phase 1
- Tajikistan: Rogun Hydropower Development Project - Phase 1
