logo

Pamir Energy Development

Sector: Residential • Location: Tajikistan

Source: International Finance Corporation (IFC)

Project
Active

GBAO is one of the most isolated and impoverished areas of the world. It experiences long cold harsh winters. During the Soviet period, diesel power plants with subsidized fuel provided electricity to the majority of the population. With the collapse of the Soviet Union, and the subsequent civil war and sharp economic decline, fuel deliveries ceased and the plants have deteriorated beyond repai

Project Information FAQ

Project Information

5 Q
The project “Pamir Energy Development” is an infrastructure initiative in the Residential sector, located in Tajikistan. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

GBAO is one of the most isolated and impoverished areas of the world. It experiences long cold harsh winters. During the Soviet period, diesel power plants with subsidized fuel provided electricity to the majority of the population. With the collapse of the Soviet Union, and the subsequent civil war and sharp economic decline, fuel deliveries ceased and the plants have deteriorated beyond repair. As a result, the population has come to depend on fuel wood for cooking and heating. An estimated 70% of the region’s tree cover has been cut down over the decade, schools and other public institutions must be closed during the coldest periods, indoor pollution is acute, and economic activity is stifled. The household income survey undertaken for the project estimated average monthly income for a household of six at $27.The project will generate and supply electricity under a 25-year concession. It will (i) take control of the assets of the state utility (around 40 MWs generation capacity in total) serving 200,000 people, (ii) expand the main Soviet era hydro-plant from 14 MWs to 28 MWs, and construct a river regulating structure at an upstream lake (to provide better winter flows), and (iii) rehabilitate other generation, transmission and distribution assets. In addition, the project will provide tariff subsidy mechanisms to ensure a minimum level of electricity for the poorest. In order to lower the project tariff and provide tariff subsidy mechanisms, IDA is expected to fund the project together with a grant from the Government of Switzerland.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data