Pamir Private Power Project

Closed · Tajikistan

Source: World Bank Group

The objective of the Pamir Private Power Project, is to improve reliability, and enhance the quality of electricity supply in the Gorno Badakshan Autonomous Oblast region, through private sector involvement, in a financially, environmentally, and socially sustainable manner. The project components shall include: 1) completion of the existing Pamir hydro plant, and the associated Lake Yashikul regu

Status
Closed
Sector
Road, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Hydro, Residential, Government, Commercial
Location
Tajikistan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Pamir Private Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Pamir Private Power Project” is an infrastructure initiative in the Road sector, located in Tajikistan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Pamir Private Power Project, is to improve reliability, and enhance the quality of electricity supply in the Gorno Badakshan Autonomous Oblast region, through private sector involvement, in a financially, environmentally, and socially sustainable manner. The project components shall include: 1) completion of the existing Pamir hydro plant, and the associated Lake Yashikul regulating structure, which will entail the construction of a temporary diversion channel, and a spillway at the lake's secondary outlet, to then build a permanent outlet regulating structure at the main natural outlet. The objective is to regulate the lake's outflow, and increase water availability to the Pamir Hydro Plant in winter (low flow period). Access roads to the diversion/spillway area, a small channel at the spillway (to temporary lower the lake's water levels during construction), and a control operation station will also be constructed. Civil works are also included for the repairs and rehabilitation of tunnels, penstock, surge tank, and related works for the hydro pant infrastructure; 2) rehabilitation of units 1, and 2 of the Pamir hydro plant, as well as the plants at Vanj, Khorough, and Namangut, which will include general overhaul, new turbines, and control/protection systems upgrade, as needed; 3) rehabilitation of transmission lines, and substations in the project area; and, 4) technical assistance, and consulting services, to be financed by PamirEnergy and the International Finance Corporation, covering procurement services, and operational and management assistance of the utility for a period of four years. Computerization, office equipment, and training will be financed.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Tajikistan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Hydro, Residential, Government, Commercial

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project