Pamir Private Power Project
Closed · Tajikistan
Source: World Bank Group
The objective of the Pamir Private Power Project, is to improve reliability, and enhance the quality of electricity supply in the Gorno Badakshan Autonomous Oblast region, through private sector involvement, in a financially, environmentally, and socially sustainable manner. The project components shall include: 1) completion of the existing Pamir hydro plant, and the associated Lake Yashikul regu
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Hydro, Residential, Government, Commercial
- Location
- Tajikistan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Pamir Private Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of the Pamir Private Power Project, is to improve reliability, and enhance the quality of electricity supply in the Gorno Badakshan Autonomous Oblast region, through private sector involvement, in a financially, environmentally, and socially sustainable manner. The project components shall include: 1) completion of the existing Pamir hydro plant, and the associated Lake Yashikul regulating structure, which will entail the construction of a temporary diversion channel, and a spillway at the lake's secondary outlet, to then build a permanent outlet regulating structure at the main natural outlet. The objective is to regulate the lake's outflow, and increase water availability to the Pamir Hydro Plant in winter (low flow period). Access roads to the diversion/spillway area, a small channel at the spillway (to temporary lower the lake's water levels during construction), and a control operation station will also be constructed. Civil works are also included for the repairs and rehabilitation of tunnels, penstock, surge tank, and related works for the hydro pant infrastructure; 2) rehabilitation of units 1, and 2 of the Pamir hydro plant, as well as the plants at Vanj, Khorough, and Namangut, which will include general overhaul, new turbines, and control/protection systems upgrade, as needed; 3) rehabilitation of transmission lines, and substations in the project area; and, 4) technical assistance, and consulting services, to be financed by PamirEnergy and the International Finance Corporation, covering procurement services, and operational and management assistance of the utility for a period of four years. Computerization, office equipment, and training will be financed. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Tajikistan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Hydro, Residential, Government, Commercial |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Tajikistan
- Dangara-Guliston Road
- Dushanbe-Dangara Road and Chormakzak Tunnel Construction Project Phase 2
- Rehabilitation of Kurgantube-Dusty, phase 2
- Additional construction work in the “Istiqlol” Tunnel
- Dushanbe-Uzbekistan Border Road Improvement Project
- Dushanbe-2 Power Plant Expansion
- The Project for Improvement of Dusty – Nijiny Pyandzh Road
- Improved Maternal and Child Health through Connectivity