logo

Panacadie Trail Phase 1 - Moncton

Sector: Water Supply and Storage • Location: New Brunswick, Canada

Source: Infrastructure Canada

Project
Completed

This project consists of the construction of trail connection from Moncton riverfront, around wetlands to Lewisville Road. The Panacadie trail is an important artery in the City’s overall trail network. It will eventually make its way from the Riverfront at South King to Mapleton Park largely following Halls Creek (thus the Acadian name of the creek, Panacadie). The trail will be built in 4 phases

Status
Closed
Sector
Water Supply and Storage, Education, Waste Processing and Treatment, Road
Location
New Brunswick, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Panacadie Trail Phase 1 - Moncton

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Panacadie Trail Phase 1 - Moncton” is an infrastructure initiative in the Water Supply and Storage sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project consists of the construction of trail connection from Moncton riverfront, around wetlands to Lewisville Road. The Panacadie trail is an important artery in the City’s overall trail network. It will eventually make its way from the Riverfront at South King to Mapleton Park largely following Halls Creek (thus the Acadian name of the creek, Panacadie). The trail will be built in 4 phases with timing being influenced by several infrastructure projects (sewer) in the East End and at the University of Moncton, as well as development in the Vision Lands. Phase 1 consists of the portion next to Andrew Lane along the marsh to East End pool/park to the corner of Botsford and St. George. It includes boardwalk and crushed stone tailing surface (total length approximately 400-metres), shade trees, shade shelter/lookout, site furniture and lighting. A call for tenders will be issued in early 2021 as the drawings are currently at 90%. The value of this phase is higher due to the elevated cost of incorporating boardwalk in much of this section.

Original sector

Active Transportation

Location

Country

Canada

State

New Brunswick

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Education, Waste Processing and Treatment, Road

Article published date

2026-03-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project