logo

Panacadie Trail Phase 1 - Moncton

Sector: Water Supply and Storage • Location: New Brunswick, Canada

Source: Infrastructure Canada

Project
Completed

This project consists of the construction of trail connection from Moncton riverfront, around wetlands to Lewisville Road. The Panacadie trail is an important artery in the City’s overall trail network. It will eventually make its way from the Riverfront at South King to Mapleton Park largely following Halls Creek (thus the Acadian name of the creek, Panacadie). The trail will be built in 4 phases

Project Information FAQ

Project Information

4 Q
The project “Panacadie Trail Phase 1 - Moncton” is an infrastructure initiative in the Water Supply and Storage sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project consists of the construction of trail connection from Moncton riverfront, around wetlands to Lewisville Road. The Panacadie trail is an important artery in the City’s overall trail network. It will eventually make its way from the Riverfront at South King to Mapleton Park largely following Halls Creek (thus the Acadian name of the creek, Panacadie). The trail will be built in 4 phases with timing being influenced by several infrastructure projects (sewer) in the East End and at the University of Moncton, as well as development in the Vision Lands. Phase 1 consists of the portion next to Andrew Lane along the marsh to East End pool/park to the corner of Botsford and St. George. It includes boardwalk and crushed stone tailing surface (total length approximately 400-metres), shade trees, shade shelter/lookout, site furniture and lighting. A call for tenders will be issued in early 2021 as the drawings are currently at 90%. The value of this phase is higher due to the elevated cost of incorporating boardwalk in much of this section.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data