logo

Panama Canal

Sector: Water Supply and Storage • Location: Panama

Source: International Finance Corporation (IFC)

Project
Active

IFC is one of several financial institutions being considered by the Panama Canal Authority (ACP, a sub-national entity of the Republic of Panama) to finance the expansion of the Panama Canal (henceforth the “Canal”). The expansion will be the largest project at the Canal since its original construction. A Canal expansion will double capacity and allow more traffic. The project will create a ne

Project Information FAQ

Project Information

4 Q
The project “Panama Canal” is an infrastructure initiative in the Water Supply and Storage sector, located in Panama. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

IFC is one of several financial institutions being considered by the Panama Canal Authority (ACP, a sub-national entity of the Republic of Panama) to finance the expansion of the Panama Canal (henceforth the “Canal”). The expansion will be the largest project at the Canal since its original construction. A Canal expansion will double capacity and allow more traffic. The project will create a new lane of traffic along the Canal through the construction of a new set of locks. The Canal’s entrances at the Atlantic and Pacific channels will be widened and deepened, as well as the navigational channel at Gatun Lake. One lock complex will be located on the Pacific side to the southwest of the existing Miraflores Locks. The other complex will be located to the east of the existing Gatun Locks. All of the expansion activities will be located within the existing confines of the Canal property under the control of the ACP and in areas that have been impacted by previous Canal activities. Construction for the project is slated to conclude by 2014.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data