logo
ProjectActive

Panama Canal

Active · Panama

Source: IFC Project Disclosures

IFC is one of several financial institutions being considered by the Panama Canal Authority (ACP, a sub-national entity of the Republic of Panama) to finance the expansion of the Panama Canal (henceforth the “Canal”). The expansion will be the largest project at the Canal since its original construction. A Canal expansion will double capacity and allow more traffic. The project will

Status
Prospective
Sector
Seaport, Road, Water Supply and Storage
Location
Panama
Updated
19 Nov 2026
Source
IFC Project Disclosures

ConstructChat

Ask ConstructChat about Panama Canal

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Panama Canal” is an infrastructure initiative in the Seaport sector, located in Panama. Taiyo aggregates data on it from IFC Project Disclosures.

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

IFC is one of several financial institutions being considered by the Panama Canal Authority (ACP, a sub-national entity of the Republic of Panama) to finance the expansion of the Panama Canal (henceforth the “Canal”). The expansion will be the largest project at the Canal since its original construction. A Canal expansion will double capacity and allow more traffic. The project will create a new lane of traffic along the Canal through the construction of a new set of locks. The Canal’s entrances at the Atlantic and Pacific channels will be widened and deepened, as well as the navigational channel at Gatun Lake. One lock complex will be located on the Pacific side to the southwest of the existing Miraflores Locks. The other complex will be located to the east of the existing Gatun Locks. All of the expansion activities will be located within the existing confines of the Canal property under the control of the ACP and in areas that have been impacted by previous Canal activities. Construction for the project is slated to conclude by 2014.

Original sector

BB - Port and Harbor Operations

Location

Country

Panama

Source

Source

IFC Project Disclosures

URL

More Details

Record type

Project

Sector

Seaport, Road, Water Supply and Storage

Article published date

2026-09-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project