Panda Express (Daytona Beach, FL)
One of 10,000+ projects Taiyo tracks in Florida.
Source: Dodge
New Ground up building with Sitework. 2,697 SF Div. 2 - Site Demo, Utility, E&S, excavation, grading, cuts/ fills, drainage, sanitary, site water, electric and phone conduit u/g, site lighting, concrete/asphalt paving, site concrete, dumpster pad, signs and striping, landscaping/irrigation Div. 3 - Building concrete, excavation, foundation, footings Div. 4 - Masonry: CMU, Brick, Coronado Stone Div
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Raw Materials, Power Generation (CCGT), Consumer Products, Steel, Cement, Road, Power Transmission, Waste Processing and Treatment, Metal
- Location
- Daytona Beach, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Panda Express (Daytona Beach, FL)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Sub Bidding, Start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | New Ground up building with Sitework. 2,697 SF Div. 2 - Site Demo, Utility, E&S, excavation, grading, cuts/ fills, drainage, sanitary, site water, electric and phone conduit u/g, site lighting, concrete/asphalt paving, site concrete, dumpster pad, signs and striping, landscaping/irrigation Div. 3 - Building concrete, excavation, foundation, footings Div. 4 - Masonry: CMU, Brick, Coronado Stone Div. 5 - Steel: Structural/Misc Div. 6 - Carpentry Rough & Finish, Wood Package, Millwork Div. 7 - R... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Daytona Beach |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Raw Materials, Power Generation (CCGT), Consumer Products, Steel, Cement, Road, Power Transmission, Waste Processing and Treatment, Metal |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
